Prompt file imported from chack411/hve-starter-templates (
.github/prompts/14-review-phase-gate.prompt.md). Copyright stays with the author.
Review the requested phase or implementation task against docs/project-status.md, required templates, approved upstream artifacts, and traceability.
When the mode is 短時間試作, review the primary flow using the selected 確認方法. With 最後にまとめて確認, run one consolidated review. With 工程ごとに確認, include the recorded approvals and changes from each process in the final review. Require executed validation and linked REQ, TASK, and TEST evidence. Treat recorded optional-document omissions as limitations, not automatic failures. Return FAIL when the primary flow is not runnable, validation is absent or failing, evidence is contradictory, or a critical safety condition remains.
- Check required sections, evidence quality, assumptions, contradictions, unresolved risks, and stable-ID links.
- Check that the current operation's start and end datetimes were captured through
execute, include UTC offsets, and produce a consistent elapsed duration. Report時刻未記録for the current operation as a procedure failure, while leaving unrecoverable historical records unchanged. - For implementation, require acceptance evidence and actual validation results.
- List findings first in severity order with artifact paths and IDs.
- Summarize requirement and test coverage.
- Return exactly one verdict:
PASS,CONDITIONAL, orFAIL, with required actions.
Do not edit files, implement corrections, or grant user approval.